This supplement was submitted to PA DEP with the Act 537 Plan. Click on the links below to view the following documents. Cover Table of Contents Tab 1 Resident letters submitted during the 30-day submission period. Responses were received until 8/31/05. Tab 2 UMT response to resident letters. This information was mailed out on 9/25/05 Read More…
APPENDIX M Highlights of Appendix M Analysis Summary Vera Cruz Needs Survey South 7th Street Needs Analysis Survey Data Figures Vera Cruz DEP Needs Analysis South 7th Street Needs Analysis Tables Vera Cruz Area South 7th Street
APPENDIX G Highlights of Appendix G Background Delineation of Study Areas Review of Existing Conditions Review of Historical Records Field Survey of Onsite Systems Sewage Needs Evaluation Figures Figure 2-1 Figure 3-1 Figure 4-1 Tables Appendix G Table
SECTION 4 Highlights of Section 4 Implementation Schedule Act 537 Plan Revision Implementation of Sewer Alternatives Septic Management District Institutional Requirements Vera Cruz Area Project Financing User Charges On-Lot Grinder Pump Units Additional Funding Figures There are no figures for this section. Tables Tables (4-1) through (4-6) are found within Section 4.
SECTION 3 Highlights of Section 3 Evaluation of Alternatives Description of Alternatives Sewer System Alternatives – Alternative #1-11 Onsite System Treatment Alternatives Evaluation of Alternatives Facility Capacity Analysis Financial Analysis Environmental Impact Analysis Figures Figure 3-1 Figure 3-2 Figure 3-3 Figure 3-4 Figure 3-5 Figure 3-6 Figure 3-7 Figure 3-8 Figure 3-9 Figure 3-10 Figure Read More…
SECTION 2 Highlights of Section 2 Background Planning Objectives and Needs Physical Description of Planning Area Existing Wastewater Treatment Facilities Evaluation of Wastewater Treatment Needs Sewer Service Area Delineation Review of Population Projections Wastewater Flow Projections Figures Figure 2-1 Figure 2-2 Figure 2-3 Figure 2-4 Figure 2-5 Figure 2-6 Figure 2-7 Figure 2-8 Figure 2-9 Read More…
SECTION 1 Highlights of Section 1 Plan Summary Final Plan Recommendations Service Areas / Problems Evaluated / Summary of Alternatives Recommended Plan 1-6 Institutional Arrangements Implementation Figures 1-1 1-2 Tables 1-1